ChargeDekho
YoChargeCars · Open 24×7

Reliable Charge Sector 135 Sector 135, Wazidpur, Sector 130, Noida, Bajidpur, Uttar

Sector 135, Noida, Uttar Pradesh, 201304, India, Maharshi Nagar, Delhi NCR, 201304

Navigate

Chargers here

Prices as listed on Statiq, 18 Sept 2026
ConnectorPowerPriceStatus at sourceWorks with
CCS2 (DC fast)240 kW₹21.00/kWhfaultedAll current Indian electric cars (Nexon, Punch, Curvv, Windsor, Creta Electric, XEV 9e, BE 6, ZS EV)
CCS2 (DC fast)240 kW₹21.00/kWhfaultedAll current Indian electric cars (Nexon, Punch, Curvv, Windsor, Creta Electric, XEV 9e, BE 6, ZS EV)
CCS2 (DC fast)120 kW₹21.00/kWhavailableAll current Indian electric cars (Nexon, Punch, Curvv, Windsor, Creta Electric, XEV 9e, BE 6, ZS EV)
CCS2 (DC fast)120 kW₹21.00/kWhchargingAll current Indian electric cars (Nexon, Punch, Curvv, Windsor, Creta Electric, XEV 9e, BE 6, ZS EV)

Google lists 24 connectors here: 16 available and 0 out of service when read on 25 Sept 2026.

What a session costs here

Estimate for a Nexon EV (45 kWh), 20% → 80% on a 240 kW charger. Energy at ₹21.00/kWh (listed here). Idle and parking fees are extra where they apply.

Energy added27 kWh · about 27 min
Energy cost₹567

Other cars: Punch EV 21 kWh, ₹441 · Windsor EV 23 kWh, ₹479 · Creta Electric 31 kWh, ₹648 · XEV 9e 47 kWh, ₹995. Full calculator on the Delhi NCR price page.

How to start a charge

  1. 1Park in the EV bay and note the charger number.
  2. 2Open the YoCharge app or scan the QR code on the charger.
  3. 3Pay in the app and start the session.
  4. 4Plug in and confirm the charger shows it is delivering power.

Driver reports

No driver reports yet. Reports from the last 30 days set the status at the top of this page.

What drivers say on Google

The EV station is occupied by ev taxi drivers and don't let the private vehicles come in to charge. The narrow road will allow only one vehicle to pass at one point in time.

Anurag Saxena · 1/5 · 6 months ago

This is current location please addd

Pankaj Singh · 5/5 · 4 months ago

Reliable Charge's charger proved to be quite efficient. Charging an EV became a breeze.

Aakash Gupta · 5/5 · 6 months ago

Excerpts from public Google reviews of this place; 4.4 from 9 reviews on Google. Read them on Google Maps →

Quick answers

What connectors does Reliable Charge Sector 135 Sector 135, Wazidpur, Sector 130, Noida, Bajidpur, Uttar have?

Reliable Charge Sector 135 Sector 135, Wazidpur, Sector 130, Noida, Bajidpur, Uttar lists CCS2 (DC fast), Type 2 AC, other across 4 guns, rated up to 240 kW.

How much does charging cost at Reliable Charge Sector 135 Sector 135, Wazidpur, Sector 130, Noida, Bajidpur, Uttar?

₹21.00 per kWh as listed on Statiq on 18 September 2026. A 20–80% session on a Nexon EV (45 kWh) adds about 27 kWh, about ₹567. Parking and idle fees are extra where they apply.

Is Reliable Charge Sector 135 Sector 135, Wazidpur, Sector 130, Noida, Bajidpur, Uttar working right now?

Statiq's app showed "Open Now | Available" on 18 September 2026. No driver report has been filed here yet; add one after your visit.

How do I pay at Reliable Charge Sector 135 Sector 135, Wazidpur, Sector 130, Noida, Bajidpur, Uttar?

Through the YoCharge app: scan the QR code on the charger, pay by wallet or UPI, and start the session.