Nera 110Kv Substation
Nera 110Kv Substation, Ulliyeri, ULLIYERI, Kozhikode, 673323
Chargers here
Price not listed by the operator| Connector | Power | Price | Status at source | Works with |
|---|---|---|---|---|
| Bharat AC-001 | up to 15 kW | Not listed | Not listed | Cars and three-wheelers with the Bharat AC socket |
| Bharat DC-001 | up to 15 kW | Not listed | Not listed | Older Indian EVs with the Bharat DC connector |
| TYPE II AC | up to 15 kW | Not listed | Not listed | See the operator's app |
What a session costs here
Estimate for a Nexon EV (45 kWh), 20% → 80% on a 15 kW charger. Energy at the operator's rate. Idle and parking fees are extra where they apply.
Other cars: Punch EV 21 kWh · Windsor EV 23 kWh · Creta Electric 31 kWh · XEV 9e 47 kWh. Full calculator on the Kozhikode price page.
How to start a charge
- 1Park in the EV bay and note the charger number.
- 2Open the BPM app or scan the QR code on the charger.
- 3Pay in the app and start the session.
- 4Plug in and confirm the charger shows it is delivering power.
Driver reports
No driver reports yet. Reports from the last 30 days set the status at the top of this page.
Quick answers
What connectors does Nera 110Kv Substation have?
Nera 110Kv Substation lists Bharat AC-001, Bharat DC-001, type_ii_ac across 12 guns, rated up to 15 kW.
How much does charging cost at Nera 110Kv Substation?
Neither this station nor BPM publishes a per-unit rate on a public page. The app shows the price before you start.
Is Nera 110Kv Substation working right now?
No live status is published for this station. It is listed in BEE register. Report your visit to set its status for other drivers.
How do I pay at Nera 110Kv Substation?
Through the BPM app: scan the QR code on the charger, pay by wallet or UPI, and start the session.